Shandong Changxin Chemical Co., Ltd. NMP wastewater treatment project
2024/07/04 14:19

The designed water volume of this project is 2000m3/d, which mainly treats NMP. It adopts pretreatment + anaerobic + A/O process to reduce the effluent COD to less than 100 mg/L.




